Big Green Egg - EGGhead Forum - The Ultimate Cooking Experience...
Avatar

Howdy, Stranger!

It looks like you're new here. If you want to get involved, click one of these buttons!

Friends

Welcome to the EGGhead Forum - a great place to visit and packed with tips and EGGspert advice! You can also join the conversation and get more information and amazing kamado recipes by following Big Green Egg at:

Facebook  |  Twitter  |  Instagram  |  Pinterest  |  Youtube  |  Vimeo
Share your photos by tagging us and using the hashtag #EGGhead4Life.


In Atlanta? Come visit Big Green Egg headquarters, including our retail showroom, the History of the EGG Museum and Culinary Center!  3786 DeKalb Technology Parkway, Atlanta, GA 30340.

acutsh1

About

Username
acutsh1
Joined
Visits
23
Last Active
Roles
Member
Points
1
Posts
11

Comments

  • bigphil said:  PS grid on that and about 3-1/2 to 4 inch risers and the stone sitting on those .  what are you using to raise 3 1/2 inches? nolaegghead suggested getting some bricks from in an earlier  post. I do not have the bge legs
  • Shiff said: I bought an inexpensive IR thermometer which is very useful for this measurement.  any suggestions on brand/type of thermometer? I am going to pick one up so i am not guessing
  • flynnbob said: waltinva said: We have done pizza twice with legs up-grate-stone and they came out fine. Second time we used  parchment paper under the pizza to slide it on the stone then pulled it out after a couple min. That was the b…
  • Raised stone 2 inches above base rim ; bottom of pizza  still beat top in being cooked by 50% (time). I think i will try a lower temperature 450-475 and see if that helps
  • Carolina Q said: Gotta have airspace! I don't think I've ever even seen an XL, or 21" stone. Here is my legs down setup on my large. From the platesetter (it's plate, btw ) to the top of the 14" stone is 3 3/4"At that height, I have approximat…
  • R2Egg2Q said: plate setter legs up and legs down and didn't notice any difference in the end result but I always have an air gap between the PS & pizza stone. What kind of dough are you using? I've found some store bought doughs can't handle …
  • Hi54putty said: Try legs up, grate, pizza stone. That should solve your problem. Will do. thx
  • nolaegghead said: Don't worry about air flow around the dome and the stone - think about the area of your bottom vent, you just need 1/2" clearance around a 21" stone to exceed that. Good to know thanks
Click here for Forum Use Guidelines.